Difference between revisions of "BXadmin:Power"

From CCGB
Jump to: navigation, search
(OPP Panel measurements)
Line 9: Line 9:
 
== OPP Panel measurements ==
 
== OPP Panel measurements ==
 
=== Jun 02, 2010 ===
 
=== Jun 02, 2010 ===
CRP
+
Panel CRP
 
* A = 0
 
* A = 0
 
* B = 0
 
* B = 0
Line 15: Line 15:
 
VA_total = 0
 
VA_total = 0
  
CRP2
+
Panel CRP2
 
* A = 55A
 
* A = 55A
 
* B = 45A
 
* B = 45A
Line 21: Line 21:
 
VA_total = 19200VA
 
VA_total = 19200VA
  
P509
+
Panel P509
 
* A = 1.7A
 
* A = 1.7A
 
* B = 11A
 
* B = 11A
Line 27: Line 27:
 
VA_total = 3036VA
 
VA_total = 3036VA
  
SB5
+
Panel SB5
 
* A = 10A
 
* A = 10A
 
* B = 42A
 
* B = 42A
 
* C = 37A
 
* C = 37A
 
VA_total = 10680VA
 
VA_total = 10680VA
 +
 +
VA was calculated assuming Line-Neutral voltage of 120V, and assuming no neutral current.
  
 
Room 509 VA_total = 32916 VA
 
Room 509 VA_total = 32916 VA

Revision as of 15:09, 2 June 2010

Panels

UPSes

PDUs

Measurements

OPP Panel measurements

Jun 02, 2010

Panel CRP

  • A = 0
  • B = 0
  • C = 0

VA_total = 0

Panel CRP2

  • A = 55A
  • B = 45A
  • C = 60A

VA_total = 19200VA

Panel P509

  • A = 1.7A
  • B = 11A
  • C = 12.6A

VA_total = 3036VA

Panel SB5

  • A = 10A
  • B = 42A
  • C = 37A

VA_total = 10680VA

VA was calculated assuming Line-Neutral voltage of 120V, and assuming no neutral current.

Room 509 VA_total = 32916 VA

Assuming VA = W (PF should not affect heat dissipation)... Room 509 BTU/h = 112309 BTU/h Room 509 tons = 9.36 tons